Manage financial ledger entries for your project. Add new entries or edit existing ones.
Project:
Display Currency:
Ledger ID
Date
Type
Flow
From Account
To Account
Category
WBS Item
Description
Amount
Currency
Display Currency
Action
576
01-Jun-2027
Forecast
Out
Project
Vendor(x)
PROVISIONAL M6/6: Local technical supervision, inspections and materials testing. Separate from PHC
1
[GanttPack:1fd9b735e80e7db5036c81cc41f8ebb7:budget_00038] PROVISIONAL M6/6: Local technical supervision, inspections and materials testing. Separate from PHC assurance. · 2027-04 · unit 1 · Ledger #144 · Forecast · Planning and supervision
1,000.00
USD
$ 1,000.00 (USD)
577
01-Jun-2027
Forecast
Out
Project
Vendor(x)
PROVISIONAL M6/6: Plaster, floors, paint and accessible entrances/ramps/paths. Design and quantities
3
[GanttPack:1fd9b735e80e7db5036c81cc41f8ebb7:budget_00039] PROVISIONAL M6/6: Plaster, floors, paint and accessible entrances/ramps/paths. Design and quantities unverified. · 2027-04 · unit 1 · Ledger #145 · Forecast · Building works · 3
8,000.00
USD
$ 8,000.00 (USD)
578
01-Jun-2027
Forecast
Out
Project
Vendor(x)
PROVISIONAL M6/6: Basic electrical installation, lighting and limited solar provision. Supply/load d
4
[GanttPack:1fd9b735e80e7db5036c81cc41f8ebb7:budget_00040] PROVISIONAL M6/6: Basic electrical installation, lighting and limited solar provision. Supply/load design unverified. · 2027-04 · unit 1 · Ledger #146 · Forecast · Water sanitation and power ·
[GanttPack:1fd9b735e80e7db5036c81cc41f8ebb7:budget_00041] PROVISIONAL M6/6: Classroom desks/seating, teaching boards and basic storage. Pupil/room quantities unverified. · 2027-04 · unit 1 · Ledger #147 · Forecast · Furniture and handover · 5
9,000.00
USD
$ 9,000.00 (USD)
580
01-Jun-2027
Forecast
Out
Project
Vendor(x)
PROVISIONAL M6/6: Fire/safety equipment, final clean, handover documents and maintenance orientation
5
[GanttPack:1fd9b735e80e7db5036c81cc41f8ebb7:budget_00042] PROVISIONAL M6/6: Fire/safety equipment, final clean, handover documents and maintenance orientation. · 2027-04 · unit 1 · Ledger #148 · Forecast · Furniture and handover · 5
4,000.00
USD
$ 4,000.00 (USD)
581
01-Jun-2027
Forecast
Out
Project
Vendor(x)
Contingency
M6
[GanttPack:1fd9b735e80e7db5036c81cc41f8ebb7:budget_00043] PROVISIONAL M6/6: Uncommitted risk reserve. Timing illustrative; release against approved changes and reduce reserve to avoid double counting. · 2027-04 · unit 1 · Ledger #150 · Forecast · Con
3,000.00
USD
$ 3,000.00 (USD)
894
01-Jun-2027
Forecast
Out
Project
Vendor(x)
PROVISIONAL M6/6: Local technical supervision, inspections and materials testing. Separate from PHC
1
[GanttPack:480cfc599b1266ef586515df1e08d19d:budget_00184] [GanttPack:e21ba376164129126239caed1b8bfe2d:budget_00037] PROVISIONAL M6/6: Local technical supervision, inspections and materials testing. Separate from PHC assurance. · 2027-04 · unit 1 · Le
1,000.00
USD
$ 1,000.00 (USD)
895
01-Jun-2027
Forecast
Out
Project
Vendor(x)
PROVISIONAL M6/6: Plaster, floors, paint and accessible entrances/ramps/paths. Design and quantities
3
[GanttPack:480cfc599b1266ef586515df1e08d19d:budget_00185] [GanttPack:e21ba376164129126239caed1b8bfe2d:budget_00038] PROVISIONAL M6/6: Plaster, floors, paint and accessible entrances/ramps/paths. Design and quantities unverified. · 2027-04 · unit 1 ·
8,000.00
USD
$ 8,000.00 (USD)
896
01-Jun-2027
Forecast
Out
Project
Vendor(x)
PROVISIONAL M6/6: Basic electrical installation, lighting and limited solar provision. Supply/load d
4
[GanttPack:480cfc599b1266ef586515df1e08d19d:budget_00186] [GanttPack:e21ba376164129126239caed1b8bfe2d:budget_00039] PROVISIONAL M6/6: Basic electrical installation, lighting and limited solar provision. Supply/load design unverified. · 2027-04 · unit